The purpose of the proposed project is to remove remnants of the old pier and rebuild it in the same location but stronger, higher, and more resilient to future storms and hurricanes. This requires a supporting structure of new concrete pilings, concrete bents, and beams, which are designed to remain in place even if a future storm removes the decking and superstructure. The walking surface will consist of IPE hardwood which made up the attractive and popular surface of the old pier. The new pier will be the same 1000’ length and 12’ width as the old pier but will have bump outs to accommodate benches with unobstructed viewpoints. The superstructure will be made up by two structures mid-way and one at the end of the pier with iconic Polynesian roof lines that differentiate Naples Pier from all others in Florida.  
A site visit to the Naples Pier located at the west end of 12th Avenue South will take place directly after the Non-Mandatory Pre-Bid.  Prospective Bidders are strongly encouraged to attend.   

It is the City’s Intent to Invite the Awarded Firms from RFQ 23-036 to submit a Bid in response to this Invitation to Bid (ITB) to serve as the Prime Contractor for the Project. Any contractor who plans to submit a bid for this Project must be pre-qualified through the RFQ process. 23-036 Naples Pier Reconstruction– RFQ is posted on the City website: https://www.naplesgov.com/purchasing/page/23-036-naples-pier-reconstruct...
Supplemental interested contractors not awarded in RFQ 23-036 must notify the City as to submit their qualifications pursuant to RFQ 23-036 and, if deemed qualified, may submit their bids or proposals in response to the solicitation.  