SUMMARY/SCOPE OF WORK

The concrete pilings, concrete bents and original overwater structures were built and installed in the mid 1990’s, pier restoration was completed in 2015 and Hurricane Irma repairs were completed in 2018.  During the 2018 hurricane repair work, bugholes and rust was observed on many of the concrete pilings and grade beams.

Assessments have been completed to better determine the source and condition of the rust.  Specifications and drawings found hereon were then developed to repair the pilings and bent beams.